No headersSecond Progress Meeting report:
- ATCA-PTSW-AMC4 and ATCA-RTM-Host modifications ready (as of late Nov. 2011).
- ATCA-PTSW-AMC4 manual first draft ready
- Board production plan first draft ready;
- Board enginnering design first draft ready;
- Boards production: quotations for fabrication received - evaluation in progress (see attached files).
- ATCA-PTSW-AMC4 and ATCA-RTM-Host BOMs concluded.
- Component stock verification - in progress (about 80% of components arrived)
- Hardware engineering files and hardware production files to be stored on ITER SVN - awaiting access login.
- Board tests to be done listed into the Test Plan section - in progress;